内射干少妇亚洲69xxx丨97人人模人人爽人人喊电影丨黑人上司好猛我好爽中文字幕丨欧美猛少妇色xxxxx丨一区一区三区产品乱码

關閉 您好,檢測到您使用的是Internet Explorer 6,建議升級瀏覽器以達視覺到最佳效果及最佳瀏覽速度。 Google ChormeFirefoxInternet Explorer 8
CN / EN Only 771 days left from the opening

Home > News & Media > Exploration in the construction of energy-saving mystery of China's tallest building

Exploration in the construction of energy-saving mystery of China's tallest building



Project Overview
Wuhan Green Center project is located in the central business district of Wuchang BinJiangarea. It is 636 meters high, is a including a collection of office, apartment, hotel and clubbing; therefore, it is one of the complex projects, playing the second goal, China's tallest building in the world. The total floor area of the project is 323,088 square meters, the tower comprises five layers to 66 layers with a total area of about 202,430 square meters of office space,70 layers to 89 layers with a total area of about 59,324 square meters of commercial apartments,90 layers to 125 layers with a total area approximately 61,334 square meters of top hotels. The tower has five basements, including equipment, buildings, unloading area, garage and mezzanine space for bike parking.



Currently, theproject has beencompletedon the groundmore than60 meters, it is expected tocomplete the structuralcapnext year,in 2018completed andput into operation.

International Green Building Certification
Wuhan Green Center is positioned as a "green energy-saving building” at design stage. To this end, Lloyd invited Shanghai Power Technology Group Inc.'s serving as green technology consultant to provide its wide range of green consulting services. The technology group and its design team put much effort for more than a year until 19 December 2012. Through the pre-certification of USGBC, the project was rated at 67 points out of 110 points, which reached the Gold Level as it was more than 60 points.



WuhanGreen CenterUSLEED-CSGold pre-certification

List of Energy Saving Technologies

1. High performanceglass curtain wall
Building envelope projects high-protective performance through sophisticated envelope calculation. As a result, it can reduce the cooling load large extent and energy consumption of air conditioning systems.

2. The Level of External Shading
Project set four perforated shades upon each floor level, covering the entire façade around outside. This setting not only can prevent strong sunlight leading to high temperature in summer, but also an menthe requirements of natural illumination interior principle.



The Diagram of Outer Horizontal Shading Effect

3. Low Emission of Environmentally Friendly Materials
For interior decoration, the project will use environmentally friendly materials, such as VOC and formaldehyde emissions decoration materials, to meet national standards and US standards referenced by LEED. Afterwards, renovations can ensure good indoor air quality. 

4.Rain Water Recovery Systems
Project uses rainwater recycling systems, to collect rainwater after simple treatment, green irrigation and roads for the project within the wash. This system not only can have a good water-saving effect, but also can ease the pressure of municipal storm drainage network.



RainwaterRecyclingSystem Diagram

5. Efficient Water-Saving Appliances
The project fully used of water-saving appliances, and all toilet water appliances (toilets, urinals, faucets, etc.), such as low-flow appliances and bathroom faucets automatic shut-off valve, to reduce water waste and achieve a good water-saving effect??

6. Waste Recycling

The special construction of a water system is to collect the apartment air-conditioning condensation water and waste water in order to be processed and used for indoor flushing through the office area.

7. Efficient Chillers
Project Configuration of various speed drive of to high efficiency chillers, chilled water pumps and condensate pumps to reduce energy consumption of air conditioning systems resulting to a very good energy saving effect.



8. Ventilation-Heat Recovery system
The project relies on a fresh air heat recovery system with introducing fresh air in high temperature to indoor in winter and introducing fresh air in low temperature from outside in summer. As a result, the system can reduce the cooling load and reach the goal of energy saving.



The New Air-Cooled Heat Recovery Unit 

9. The Outdoor Air Monitoring System

Air handling units are the carbon dioxide monitoring projects to continuously monitor the amount of fresh air and the exhaust system to ensure that fresh air changes with the number of personnel changes(based on the concentration of CO2 demand control ventilation),and maintain positive pressure to a certain floor. In Each exhaust support will be installed in VAV terminal device, which the inter part is locked by BMS and fresh air, positive pressure to ensure the floor.


About BIC

Since 2013, BIC has been the first exhibition of the whole industry chain in prefabricated construction in China. BIC endeavor expand prefabricated decoration, architecture design, construction machinery, building envelope technology application, etc. Thanks to the active participation of leading brands, and closely followed national policies, expanded regional influence, and integrated domestic and global advantageous resources, BIC has become the first choice to expand your business!

More >>

Contact Us

VNU Exhibition Asia Ltd.
Add.: Business Mansion, Shanghai Exhibition Center, No.1333, Nanjing Rd(W), Shanghai, PRC (200040)
T: +86 21 6195 6097
E: bic@vnuexhibitions.com.cn

Follow Us on Wechat

Scan QRcode
Focus BIC 2019


Data protection declaration
主站蜘蛛池模板: 天堂综合久久| 男女做性无遮挡免费视频| 柠檬福利第一导航在线| 亚洲精华国产| 人人妻在人人| 波多野结衣免费视频观看| 漂亮人妻被中出中文字幕| 国产亚洲欧美日韩在线一区二区三区| 人妖干美女| 欧美日韩国产一区二区三区不卡| 亚洲一级网站| 一区二区三区视频| 亚洲三区视频| 影音先锋中文字幕人妻| 国产亚洲精品久久精品69| 国产精品无套内射迪丽热巴| 亚洲免费一级片| av无码久久久久不卡蜜桃| 人人做人人妻人人精| 久久妇女高潮喷水多| 午夜av福利在线| 性荡视频播放在线视频| 麻豆影视| 中文字幕天天躁日日躁狠狠躁免费 | av性天堂网| 成年女人永久免费观看视频| 亚洲aaa毛片| 无码帝国www无码专区色综合| 色av性av丰满av| 欧美精品亚洲精品日韩专区| 国产一级视频免费观看| 天天躁夜夜躁av天天爽| 欧美久久久久久久久| 国产精品亚洲一区二区三区在线| 丝袜亚洲综合| 国产裸体永久免费视频网站| 羞羞视频在线观看| 草草影院最新网址|